BAM Nuttall Ltd have the Framework Contract to extend the platforms on the Uckfield Line.
MegaTech Projects Ltd was awarded the contract to extend Eridge Station Platform by 100m. The station is also used by the Spa Valley Railway and the works involved co-ordinated liaison with BAM Nuttall, network Rail and Spa Valley Railway.
The platform extension was in an area of poor ground conditions which suited MPL's EPS system which is lightweight by its nature and the 100m extension was completed in April 2016.